日韩av无码久久精品免费,亚洲AV乱码中文一区二区三区 ,亚洲免费一区二区,国产一区二区三区无码视频,免费黄片链接入口,亚州码欧州码一二三区

Contact Us   
Search   
Your Position: Home > News > Company News

Standard for the installation of latex production line

2014/5/26      view:
In order to ensure that the mechanical equipment installation engineering construction quality and safety, promote technological progress, improve economic efficiency, all kinds of mechanical equipment installation engineering, must according to the construction procedure of construction. From the opening to the equipment of the empty load test for construction and acceptance of work so far (to load to the trial operation of the equipment, to the load test run), each procedure and various construction activities must be in compliance with the provisions of the construction code.


(1) the equipment installation engineering should be according to the design and construction. When the construction that design is not reasonable, should be timely amendments, and by the design change approval, can according to the design and construction after the change.


(2) mechanical equipment, installation of the main or materials used for important part, must conform to the provisions of the design and product standards, and should have the certificate.


(3) the installation of various measuring and testing instruments, apparatus, instrument and equipment, shall meet the requirements of current national standards, its accuracy should not be less than be precision inspection object.


(4) equipment concealed installation, should be checked before the concealed works, and make record, qualified rear can continue to install.


(5) the equipment installation, should carry out self inspection, mutual inspection and professional inspection, and deal with each procedure for inspection and record. The works acceptance, should be based on the record as the basis.